Gypsum Cornice Production Line

Short Description:

1. Capacity: 2000pcs/8h-10000pcs/8h
2. Automatic level: high automatic.
3. Raw material: natural gypsum powder, mesh, fiber-glass, water, addtives
4. Installation and commission: 2 workers , 15-20 days.


Product Detail

Product Tags

Product Description

The gypsum cornice machine includes screw conveyor, dry material mixer, wet mixer, roller conveyor

n1

Application

Gypsum cornice belongs to house decorative material and mainly used in indoor decoration. Except fireproof, moisture-proof, soundproof and thermal isolation, it can reach luxurious decoration effect.

n2

Description

1. Capacity: 2000pcs/8h-10000pcs/8h

2. Automatic level: high automatic.

3. Raw material: natural gypsum powder, mesh, fiber-glass, water, addtives

4. Installation and commission: 2 workers , 15-20 days.

Capacity (8hours) Power (KW) Equipment length Workers
2000/pcs 30 42m 5—6
3000/pcs 30 48m 7—8
4000/pcs 35 54m 8
5000/pcs 35 60m 8
6000/pcs 35 80m 8—9
10000/pcs 35 150m 12

Production process

n3

Application of gypsum cornice

Gypsum cornice is a kind of building decoration material for house, maily for indoor ceiling. It can be with various decorative design,which is artistic with cheap price. Except the function of fire-proof, moisture-proof,sound-proof and heat-isolated, gypsum cornice can reach luxurious decoration effect.we are provide gypsum cornice production line for sale,we can guarantee quality.

Data for gypsum cornice making machine

1. Automatic production line

2. Land area: warehouse design can be adjustable according to clients’ situation

3. Raw material: construction gypsum powder, mesh, fiber-glass, water, addtive

Gypsum Cornice Make Machine

1. Capacity: 1000-30,000 pcs per day

2. The raw material: Calcined gypsum powder,foaming agent,foaming water,mesh, glass fiber

3. Worker’s arrangement:

Working days per year: 300 days

Working hours per shift: 8 hours/shift

System Workers needed
Mixing system 1workers/shift
Forming system 1workers/shift
Cosswise transport system 1worker/1shift
Finished product release 2worker/1shift
Finished product drying 2worker/1shift
Maintenance section 1 worker/1shift
Warehouse keeper 1 worker/1shift
Monitor 1 worker/1shift
Total 10 workers/shift

  • Previous:
  • Next: